What to Do After Filing a Construction Permit: A Comprehensive Guide

"What to Do After Filing a Construction Permit" is a detailed guide that provides valuable insights and step-by-step instructions for individuals who have recently filed a construction permit. This resource aims to simplify and streamline the process, ensuring a smooth transition from permit approval to the actual construction phase. Whether you are a homeowner, contractor, or developer, this guide serves as an essential tool in navigating the post-permit phase effectively.

I. Understanding the Approval Process:

  • Explaining the construction permit approval process, ensuring a clear understanding of the next steps.
  • Detailing the typical timeline for permit approval and potential factors that may affect it.
  • Highlighting common documents or additional information required during the review process.

II. Obtaining the Necessary Documentation:

  • Providing a comprehensive checklist of all documents, permits, and certificates required after obtaining the construction permit.
  • Outlining the importance of obtaining insurance coverage and any bonding requirements associated with the project.
  • Advising on the significance of obtaining and posting necessary permits, such as building permits and zoning compliance.

III. Hiring Contractors and Subcontractors:

  • Offering guidance on selecting reputable contractors and subcontractors.
  • Discussing the importance of reviewing licenses, insurance, and

In general a permit is required for all building, electrical, and plumbing work on or to a building or structure. This is includes the following: New Constructions. Additions or Alterations.

How long does it take to get a construction permit in California?

The plans will be checked for compliance with the California Code of Regulations Title 24, Zoning Ordinance, Health Code, etc. Normal processing takes four to six weeks. Any remaining fees, including the building permit fee, are payable prior to issuance of the building permit, as well as school fees, if applicable.

Do I need a permit to build a porch in NM?

(New Mexico Residential Code 106.1) Except as specified in IRC, Section 105.2, no building or structure regulated by this code shall be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit has first been obtained from the building official.

What is the penalty for building without a permit in Massachusetts?

4 of the 7th Edition of the Massachusetts State Building Code, 780 CMR, violation of any provision of 780 CMR shall be punishable by a fine of not more than $1,000 or by imprisonment for not more than one (1) year, or both for each violation.

What happens if you build without a permit in Hawaii?

If you do not obtain the necessary permits for your project, you may be held liable for any accidents or injuries that occur as a result of your construction work. Additionally, if you try to sell your property without obtaining the required permits, you may run into legal issues and may have to pay fines or penalties.

Can you get permit after work done in California?

Fortunately, in Los Angeles California laws allow homeowners to obtain a retroactive permit after the work is done, if the work meets the minimum local building codes without demolishing the entire building and starting it from scratch.

How can I legalize unpermitted work in Florida?

The applicant must self-report all work that was done without the required permits in violation of the Florida Building Code and submit an application and all the required documentation, including but not limited to a detailed correction plan, affidavits, as-built plans, etc.

Frequently Asked Questions

What can a homeowner do without a permit in California?

Projects that change the configuration of walls, pipes, wiring, roofs, or major appliances typically DO require at least one type of building permit. Projects that DO NOT need a building permit are simple surface (cosmetic) projects; minor repairs and replacements; and minor site improvements or small structures.

Who is responsible for pulling permits in Illinois?

Ethical Contractors Pull Permits

Every contractor has their process for pulling permits before a project, but the most ethical route is for the business to pull the permit. Legitimate contractors and subcontractors take this route because they don't want someone else's name on their work.

Do you need a permit to remodel a bathroom in California?

Do You Need A Permit To Remodel A Bathroom In California? Yes, permits are required for all aspects of remodeling a bathroom. This includes making any additions or modifications that involve construction, electrical wiring, plumbing structures, and other mechanical processes.

FAQ

How long does it take to get a building permit approved in California?

The plans will be checked for compliance with the California Code of Regulations Title 24, Zoning Ordinance, Health Code, etc. Normal processing takes four to six weeks. Any remaining fees, including the building permit fee, are payable prior to issuance of the building permit, as well as school fees, if applicable.

Can you sell a house with unpermitted work California?
You can sell a house with unpermitted work. However, you're obligated to disclose any unpermitted work done in the home to buyers before they begin the home buying process. As the seller, you're responsible for acquiring and closing out any permits before the buyer signs the contract.

What can a homeowner do without a permit in NY?
Some examples of work that does not need a permit are:
  • Painting.
  • Plastering.
  • Installing new cabinets*
  • Plumbing Fixture Replacement.
  • Resurfacing floors*
  • Non-structural Roof Repair.

What to do after filing a construction permit

What requires a building permit in South Dakota?

Building permits are required for any new structures or alterations that are required to meet building codes and fire safety standards including decks, staircases, finished basements, and sheds or similar structures larger than 200 sq. ft.

Do I need a permit to remodel my bathroom in Hawaii?

In general a permit is required for all building, electrical, and plumbing work on or to a building or structure. This is includes the following: New Constructions. Additions or Alterations.

How long is a building permit good for in Michigan?

180 days

A permit is valid 180 days after the date it is issued. An extension can be granted upon a written request to the building official.

  • What happens if you get caught remodeling without a permit in Florida?
    • Failure to obtain a permit before commencing a project can result in a penalty. The fees are set out in Section 109 of the Florida Building Code as authorized in Florida Statutes 553.80. Normally the fee imposed is double the normal permit fee.

  • What building code does South Dakota use?
    • 2021 International Building Code (IBC)

      Currently Adopted Building Codes

      2021 International Building Code (IBC), which is promulgated and published by the International Code Council (ICC).

  • What can you build in Arizona without a permit?
    • Building permits are required for all structures with the exception of a structure that is less than 200 square feet with no electrical, plumbing or mechanical.